FAQs
The self erecting cranes and mini tower cranes can be powered by mains electric power or a diesel generator. The cranes require three phase power at 380v-400v.
Self erecting cranes and mini tower cranes are transported either by towing to site if they are fitted with road axles. If the crane is fitted with non road axles (to allow the cranes to move around the site) they are be transported by low loader.
The self erecting cranes erect themselves, the city type tower cranes will require a mobile crane to install and dismantle which will take longer (approximately 2 to 3 days).
Self erecting cranes and mini tower cranes can be lowered into restricted areas by mobile crane if required.
The ideal type of base is hardcore with steel plates under each outrigger or a concrete slab. Our engineers will be able to advise the best type of crane mounting during a site visit.